• About
  • Advertise
  • Subscribe
  • Contact
  • Events
Thursday, December 4, 2025
Newsletter
SUBSCRIBE
  • News
  • Ports
  • Rail
  • Roads
  • Airport
  • Utilities
  • Urban
  • State by state
    • NSW
    • NT
    • QLD
    • SA
    • TAS
    • VIC
    • WA
  • Events
No Results
View All Results
  • News
  • Ports
  • Rail
  • Roads
  • Airport
  • Utilities
  • Urban
  • State by state
    • NSW
    • NT
    • QLD
    • SA
    • TAS
    • VIC
    • WA
  • Events
No Results
View All Results
Home

New milestones reached for port project

by Lauren Cella
July 7, 2016
in Contracts awarded, News, Ports
Reading Time: 2 mins read
A A
Share on FacebookShare on Twitter

A Western Australian construction company has been awarded a tender to design and construct an operations facility at the port of Port Hedland.

Pindan Contracting will design and construct the $70.7 million Integrated Marine Operations Centre (IMOC), an operation facility with leading vessel traffic services systems and equipment.

The IMOC includes provision for the Port Harbour Master function, dredging management, port security, marine pilot briefing facilities and an improved incident control capability.

Acting Western Australia Transport Minister John Day said the centre would oversee an increasing number of vessels through the world’s largest bulk export port.

“The number of vessel movements through the Port Hedland port will be 6,000 a year when the IMOC is operational in 2018, which is more than five times the vessel volume when the existing control tower was built more than 45 years ago,” Mr Day said.

The Pilbara Ports Authority is also set to deliver a $120 million Channel Risk and Optimisation Project (CROP), which will reduce the risk of an obstruction in the Port Hedland shipping channel and allow port users to further optimise tonnages on their vessels.

The two-year project involves the creation of a new emergency passing lane, extension of a deep water refuge zone and use of existing deeper depths along the tidally constrained 42km channel.

The project will also optimise the use of the channel for the benefit of port users, with an extension to sailing windows, creating larger separations between departing vessels in a convoy, or potentially allowing an additional vessel to depart on the tidal window.

On-site works are expected to begin by the end of 2016.

Related Posts

Workers celebrate TBM Dorothy's breakthrough at Westmead. Image: Sydney Metro.

Tunnelling milestone for Sydney Metro West

by Kody Cook
December 4, 2025

Tunnelling is now complete for the western end of the Sydney Metro West project, with tunnel boring machine (TBM) Dorothy...

Image: Gudellaphoto/stock.adobe.com  

Design unveiled for $200M fix for major Sydney intersection

by Kody Cook
December 3, 2025

The NSW and Federal Governments have unveiled the design for the $200 million upgrade to one of Sydney’s busiest intersections....

Image: NSW Government.  

Fast tracking improved rail reliability

by Kody Cook
December 2, 2025

A weekend-long work blitz has taken place on the line south of Sydney to Wollongong, delivering critical maintenance and restoring...

Read our magazine

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

Infrastructure is an industry-leading magazine that brings together asset owners, statutory bodies, consulting engineers and first-tier contractors to explore the biggest news and issues across the infrastructure industry. Infrastructure is integrated across print and online and covers the latest in road, rail, airports, ports, utility and urban infrastructure.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Infrastructure

  • Advertise
  • About
  • Contact
  • Subscribe
  • Magazine
  • Events
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Projects
  • Transport
  • Civil Construction
  • Roads
  • Rail
  • Spotlight
  • Planning

© 2025 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
  • News
  • Ports
  • Rail
  • Roads
  • Airport
  • Utilities
  • Urban
  • State by state
    • NSW
    • NT
    • QLD
    • SA
    • TAS
    • VIC
    • WA
  • Events
  • About
  • Advertise
  • Contact
  • Subscribe

© 2025 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited