• About
  • Advertise
  • Subscribe
  • Contact
  • Events
Thursday, January 22, 2026
Newsletter
SUBSCRIBE
  • News
  • Ports
  • Rail
  • Roads
  • Airport
  • Utilities
  • Urban
  • State by state
    • NSW
    • NT
    • QLD
    • SA
    • TAS
    • VIC
    • WA
  • Events
No Results
View All Results
  • News
  • Ports
  • Rail
  • Roads
  • Airport
  • Utilities
  • Urban
  • State by state
    • NSW
    • NT
    • QLD
    • SA
    • TAS
    • VIC
    • WA
  • Events
No Results
View All Results
Home

New stage for Queensland’s electric superhighway

by Infrastructure Journalist
July 28, 2017
in Civil Construction, News, Planning, Projects, QLD, Roads, Sustainability, Urban Development
Reading Time: 3 mins read
A A
Share on FacebookShare on Twitter

The first locations for the initial phase of Queensland’s electric superhighway have been announced, and will be operational within the next six months.

Environment Minister and Acting Main Roads Minister, Steven Miles, officially kick-started the EV revolution in the state with the launch of the Queensland Electric Super Highway – the world’s longest in one state.

Mr Miles said the super highway will be a series of fast-charging electric vehicle stations which will be rolled out at locations right up the Queensland coast from the Gold Coast to Cairns to encourage the uptake of electric vehicles in Queensland.

“This project is ambitious, but we want as many people as possible on board the electric vehicle revolution, as part of our transition to a low emissions future,” Mr Miles said.

“I’m announcing the first 18 towns and cities that make up phase one of the Electric Super Highway and will, once operational in the next six months, make it possible to drive an electric vehicle from the state’s southern border to the Far North.

“They will be available for use at no cost for the initial phase of the super highway so we can encourage as many people as possible to start using them.”

Mr Miles said what made the announcement even more exciting was the fact that the energy supplied in the fast-charging stations would be green energy purchased through green energy credits or offsets.

“EVs can provide not only a reduced fuel cost for Queenslanders, but an environmentally-friendly transport option, particularly when charged from renewable energy,” he said.

“The Queensland Electric Super Highway has the potential to revolutionise the way we travel around Queensland in the future.”

Mr Miles said electric vehicle ownership rates around the world were increasing, largely due to significant advances in battery technology and continued cost reductions in EVs.

“The most recent Queensland Household Energy Survey showed that 50 per cent of Queenslanders will consider an electric vehicle, plug-in hybrid or regenerative braking hybrid, when purchasing a new car in the next two years and that majority said improvements to public fast-charging infrastructure would further tempt them into purchasing an EV,” Mr Miles said.

Electric Vehicle Council CEO, Behyad Jafari, said the Queensland Government was to be commended for its national leadership in support of the electric vehicle industry.

“This initial support from government serves as a signal to the market that Queensland is serious about electric vehicles and provides certainty to unlock investment to grow our economy and create new, high skilled jobs,” Mr Jafari said.

The locations of the fast-charging stations include Cairns, Tully, Townsville, Bowen, Mackay, Carmila, Marlborough, Rockhampton, Miriam Vale, Childers, Maryborough, Cooroy, Brisbane, Helensvale, Coolangatta, Springfield, Gatton and Toowoomba.

Related Posts

Road Sign stating Subject to Flooding with rainy highway in the background

Planning underway to improve highway flood resilience

by Kody Cook
January 21, 2026

Planning is underway to improve flood immunity and resilience on the Moonie Highway south of Dalby, to improve accessibility during...

Tunnel Boring Machine (TBM)

Tunnelling to resume after safety investigation

by Kody Cook
January 21, 2026

North East Link tunnelling operations are set to resume following completion of a safety investigation into a sinkhole that opened...

A hospital interior.

Upgraded emergency department moves into construction phase

by Kody Cook
January 21, 2026

Major works have begun to expand the emergency department at Austin Hospital in Heidelberg, backed by a $275 million Victorian...

Read our magazine

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

Infrastructure is an industry-leading magazine that brings together asset owners, statutory bodies, consulting engineers and first-tier contractors to explore the biggest news and issues across the infrastructure industry. Infrastructure is integrated across print and online and covers the latest in road, rail, airports, ports, utility and urban infrastructure.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Infrastructure

  • Advertise
  • About
  • Contact
  • Subscribe
  • Magazine
  • Events
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Projects
  • Transport
  • Civil Construction
  • Roads
  • Rail
  • Spotlight
  • Planning

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
  • News
  • Ports
  • Rail
  • Roads
  • Airport
  • Utilities
  • Urban
  • State by state
    • NSW
    • NT
    • QLD
    • SA
    • TAS
    • VIC
    • WA
  • Events
  • About
  • Advertise
  • Contact
  • Subscribe

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited