• About
  • Advertise
  • Subscribe
  • Contact
  • Events
Thursday, January 22, 2026
Newsletter
SUBSCRIBE
  • News
  • Ports
  • Rail
  • Roads
  • Airport
  • Utilities
  • Urban
  • State by state
    • NSW
    • NT
    • QLD
    • SA
    • TAS
    • VIC
    • WA
  • Events
No Results
View All Results
  • News
  • Ports
  • Rail
  • Roads
  • Airport
  • Utilities
  • Urban
  • State by state
    • NSW
    • NT
    • QLD
    • SA
    • TAS
    • VIC
    • WA
  • Events
No Results
View All Results
Home News

QLD $13 million electrical infrastructure upgrade underway

by Imogen Hartmann
January 13, 2020
in Civil Construction, Energy, News, QLD, Telecommunications
Reading Time: 2 mins read
A A
Workers near power lines
Share on FacebookShare on Twitter

Preliminary work has commenced on a $13 million electrical infrastructure upgrade at Powerlink’s 38-year-old Tarong Substation in Queensland.

Acting Queensland Energy Minister, Mark Ryan, said Powerlink was upgrading critical equipment to ensure a continued reliable supply of electricity to the South Burnett region.

“Tarong Substation is a major injection point in Powerlink’s transmission network, connecting the Tarong and Tarong North Power Stations to the grid,” Mr Ryan said. 

“A team of highly skilled experts will replace the substation’s aging secondary systems equipment over the next two years.

“This project will underpin the long-term safe, reliable and cost-effective performance of the transmission network in the South Burnett.”

Secondary systems are the control, protection and communications equipment that operate the transmission network and prevent damage to physical plant in the substation such as transformers.

The new secondary system control panels are currently undergoing factory acceptance testing at Powerlink’s Virginia site on Brisbane’s northside.

Crews are expected to start on-ground removal and installation works at the substation in April 2020 and continue until late 2021.

Powerlink Interim Chief Executive, Kevin Kehl, said replacing the secondary systems at Tarong Substation as necessary to maintain Powerlink’s capability to respond to any unexpected network issues.

“This project upgrades the systems that are critical to monitoring and operating our assets.”

Queensland’s publicly-owned electricity companies – Powerlink, Ergon, Energex, CS Energy, Stanwell Corp and CleanCo, will invest more than $2.2 billion on capital works in 2019-20, supporting up to 4,900 jobs.

Related Posts

Silhouette of engineer and construction team working.

Reforms to tackle construction productivity decline

by Kody Cook
January 22, 2026

The Queensland Government has responded to recommendations to improve construction productivity by committing to reforms that will reduce red tape....

Road Sign stating Subject to Flooding with rainy highway in the background

Planning underway to improve highway flood resilience

by Kody Cook
January 21, 2026

Planning is underway to improve flood immunity and resilience on the Moonie Highway south of Dalby, to improve accessibility during...

Tunnel Boring Machine (TBM)

Tunnelling to resume after safety investigation

by Kody Cook
January 21, 2026

North East Link tunnelling operations are set to resume following completion of a safety investigation into a sinkhole that opened...

Read our magazine

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

Infrastructure is an industry-leading magazine that brings together asset owners, statutory bodies, consulting engineers and first-tier contractors to explore the biggest news and issues across the infrastructure industry. Infrastructure is integrated across print and online and covers the latest in road, rail, airports, ports, utility and urban infrastructure.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Infrastructure

  • Advertise
  • About
  • Contact
  • Subscribe
  • Magazine
  • Events
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Projects
  • Transport
  • Civil Construction
  • Roads
  • Rail
  • Spotlight
  • Planning

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
  • News
  • Ports
  • Rail
  • Roads
  • Airport
  • Utilities
  • Urban
  • State by state
    • NSW
    • NT
    • QLD
    • SA
    • TAS
    • VIC
    • WA
  • Events
  • About
  • Advertise
  • Contact
  • Subscribe

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited