• About
  • Advertise
  • Subscribe
  • Contact
  • Events
Monday, January 19, 2026
Newsletter
SUBSCRIBE
  • News
  • Ports
  • Rail
  • Roads
  • Airport
  • Utilities
  • Urban
  • State by state
    • NSW
    • NT
    • QLD
    • SA
    • TAS
    • VIC
    • WA
  • Events
No Results
View All Results
  • News
  • Ports
  • Rail
  • Roads
  • Airport
  • Utilities
  • Urban
  • State by state
    • NSW
    • NT
    • QLD
    • SA
    • TAS
    • VIC
    • WA
  • Events
No Results
View All Results
Home

Reducing downtime with GPS and 3D machine control

by Lauren Butler
September 10, 2018
in Civil Construction, Features, Safety and Training, Sponsored Editorial
Reading Time: 3 mins read
A A
Share on FacebookShare on Twitter

Brendan Walsh and his team at Ground Technique have been working on a 20-lot Tran Civil development in Diamond Creek, Victoria. This project is on a large sloping block that is very undulating and requires a substantial amount of cut and fill. To complete this project, Mr Walsh installed the Topcon 3D GPS+ machine control from Position Partners on his Hitachi Zaxis 13-ton excavator.

Brendan Walsh, Director, Ground Technique, said the Topcon 3D GPS+ system has allowed the company to have no people on the ground, meaning they can use smaller excavators if required because they’re now much more efficient.

“It also means there’s no human error. The only human error will come down to the surveyors and designers and you’re always going to have surveyors and designers involved. There’s a lot less material coming out because you’re pulling out only the exact amount.”

Selecting the machine control system

For this project, Mr Walsh had considered a rover on the ground but was concerned about the downtime.

“Often blokes forget to charge batteries on those things so there’s a lot of downtime,” Mr Walsh said. “Number two, someone has to read the screen and interpret it, and in the meantime the operator is sitting there waiting.”

Mr Walsh was also interested in a 3D system over a 2D system because it meant his team didn’t need to re-bench the equipment each time they moved the machine.

“The screen on the new system in particular is very big and easy to see, and because it is 3D it’s plug-and-play essentially once the machine’s loaded,” Mr Walsh said. “There’s no recalibrating once the machine moves. With a convention 2D system every single time you move the machine you have to re-bench the machine.”

Experiencing the benefits

Prior to implementing the Topcon 3D GPS+ 3D machine control system, Ground Technique would have used the string line, lots of spray paint, lots of pegs, a surveyor on the ground, more people and a lot of interpreting plans. Mr Walsh said he’s seen many benefits since implementing the Topcon system, including increased efficiency and site safety.

“Obviously, efficiency is the main benefit, minimising the people on the ground so it keeps things safe as well. Safety is a big one on these job sites and the lack of human error,” Mr Walsh said.

Another benefit that Mr Walsh has seen since is access to Tokara Link, an Australian-designed telematics solution created specifically to improve efficiency and productivity for earthworks and civil construction projects.

Using a modem installed in the machine, Tokara Link connects your machines to the office, provides access to Position Partners’ technical support and links you to any GPS network required for the job.

“When I have the Tokara Link fired up on the GPS, I also have Bluetooth on my phone so when I’m talking to the support network down in Dandenong there, I can literally keep moving my digger and excavating while I talk to them over the phone, while I watch them play around on the screen that I’m looking at, all at the same time.

“I can watch them, what they’re doing and they can talk me through what they’re doing so it makes training really efficient.”

View more information on the Topcon 3D GPS+ system here.

Related Posts

Marrickville Metro station

Metro line completes first end to end test run

by Kody Cook
January 16, 2026

The first full line test run has been completed on the M1 Metro North West & Bankstown Line, as a...

Road works underway

Road upgrade to improve safety in North Brisbane

by Kody Cook
January 12, 2026

A three kilometre upgrade of Anzac Avenue in north Brisbane is set to improve road safety and ride quality for...

A freight train derailment.

Derailment recovery underway

by Kody Cook
January 9, 2026

Major recovery works are progressing to restore freight services on South Australia’s east-west rail corridor. The Australian Rail Track Corporation...

Read our magazine

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

Infrastructure is an industry-leading magazine that brings together asset owners, statutory bodies, consulting engineers and first-tier contractors to explore the biggest news and issues across the infrastructure industry. Infrastructure is integrated across print and online and covers the latest in road, rail, airports, ports, utility and urban infrastructure.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Infrastructure

  • Advertise
  • About
  • Contact
  • Subscribe
  • Magazine
  • Events
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Projects
  • Transport
  • Civil Construction
  • Roads
  • Rail
  • Spotlight
  • Planning

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
  • News
  • Ports
  • Rail
  • Roads
  • Airport
  • Utilities
  • Urban
  • State by state
    • NSW
    • NT
    • QLD
    • SA
    • TAS
    • VIC
    • WA
  • Events
  • About
  • Advertise
  • Contact
  • Subscribe

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited