• About
  • Advertise
  • Subscribe
  • Contact
  • Events
Tuesday, July 14, 2026
Newsletter
SUBSCRIBE
  • News
  • Ports
  • Rail
  • Roads
  • Airport
  • Utilities
  • Urban
  • State by state
    • NSW
    • NT
    • QLD
    • SA
    • TAS
    • VIC
    • WA
  • Events
No Results
View All Results
  • News
  • Ports
  • Rail
  • Roads
  • Airport
  • Utilities
  • Urban
  • State by state
    • NSW
    • NT
    • QLD
    • SA
    • TAS
    • VIC
    • WA
  • Events
No Results
View All Results
Home News

VIC Gov delivering high-capacity signalling

by Annabelle Powell
November 15, 2021
in News, Rail, VIC
Reading Time: 2 mins read
A A
Share on FacebookShare on Twitter

Victoria’s Cranbourne and Pakenham train lines will soon use high-capacity signalling (HCS) to increase the number and frequency of trains.

Crews will begin installing the new HCS equipment along the lines from mid-December 2021, which will be one of the final pieces of the puzzle to deliver a true ‘turn up and go’ network when the Metro Tunnel opens in 2025. HCS is a new signalling system that enables trains to safely run closer together, meaning they can travel more frequently. 

The project will install 55km of signalling, which will allow trains to run every two to three minutes, and has been designed to replace the current system, which uses coloured signals to indicate when it is safe for a train to proceed.

Crews will test the signalling equipment at various points along the Cranbourne and Pakenham lines over eleven days, to ensure it’s operating correctly and installed in the right location. 

Testing on the lines between Caulfield and Westall stations has already commenced, to examine communication between signalling equipment on the ground and on the train.

Buses will replace trains on some sections of the Cranbourne, Pakenham and Frankston lines from 8.30pm on Tuesday 14 December until the last service on Thursday 23 December while the signalling and testing works take place.

Coaches will replace evening trains on the Gippsland Line on Tuesday 14 December, and all services from 15 to 23 December, between Southern Cross and Pakenham stations.

Further testing along the Cranbourne and Pakenham lines will get underway in March 2022 with the new High-Capacity Metro Trains (HCMTs). 

The signalling system will operate 65 of the new high-capacity trains, which will run on the Sunbury to Cranbourne and Pakenham lines via the Metro Tunnel. 

The additional testing will ensure the signalling system and the new trains, as well as freight and V/Line trains, can safely run alongside the existing system.

Once complete, the Metro Tunnel project will create room for 121,000 passengers every week on the Cranbourne and Pakenham lines, and save passengers travelling from Cranbourne or Pakenham up to 15 minutes off a journey to Parkville, or up to 25 minutes off a journey to St Kilda Road.

Further information about the high-tech signalling works on the Pakenham and Cranbourne lines can be found online at: bigbuild.vic.gov.au.

Related Posts

Image: Nadiia/stock.adobe.com

Auckland Council joins International No-Dig Auckland as Industry Partner

by Kody Cook
July 13, 2026

International No-Dig Auckland has welcomed Auckland Council as an official Industry Partner, strengthening the event's role as the meeting place...

Goldfields pipeline upgrades move ahead

Goldfields pipeline upgrades move ahead

by Kody Cook
July 13, 2026

Construction contracts have been awarded for the first stage of the $543 million upgrade of Western Australia's Goldfields and Agricultural...

Interport appoints CEO for Gladstone project

Interport appoints CEO for Gladstone project

by Kody Cook
July 13, 2026

Interport Global has appointed ports and infrastructure executive Anthony Donald as Chief Executive Officer, as the company progresses its proposed...

Read our magazine

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

Infrastructure is an industry-leading magazine that brings together asset owners, statutory bodies, consulting engineers and first-tier contractors to explore the biggest news and issues across the infrastructure industry. Infrastructure is integrated across print and online and covers the latest in road, rail, airports, ports, utility and urban infrastructure.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Infrastructure

  • Advertise
  • About
  • Contact
  • Subscribe
  • Magazine
  • Events
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Projects
  • Transport
  • Civil Construction
  • Roads
  • Rail
  • Spotlight
  • Planning

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
  • News
  • Ports
  • Rail
  • Roads
  • Airport
  • Utilities
  • Urban
  • State by state
    • NSW
    • NT
    • QLD
    • SA
    • TAS
    • VIC
    • WA
  • Events
  • About
  • Advertise
  • Contact
  • Subscribe

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited